OUR PROJECTS:
Turnkey
Operations.
|

MACON PAPER KRAFT MILL:
Chemical Recovery Plant.
Total contract amount:$5 million
|
SCM
Glidco:
A 13-stage absorption tower was built. This turnkey operation
included fabrication and erection of all 11 processing
tanks underneath. The tower was Class I Group D explosion-proof.
Total contract amount:
$1 million. |

WEYERHAEUSER, Georgia
This bio-filter and stainless
steel exhaust system included tilt-up panels, concrete,
fabrication of structural steel and duct work. |

COTTONSEED EXTRACTION PLANT, Louisiana.
This plant was the first in
the U.S. to use a De Smet extractor. We performed all
phases of the concrete, steel fab and erect and process
piping as a turnkey operation.
Total contract cost: $3 million |
GOLD KIST, GEORGIA.
This pet food facility included tilit-up panels, concrete,
fabrication of structural steel, elevators, conveyors,
chutes and turnhead. |

PCS, White Springs, Florida
This was a challenging concrete
spillway job which required quick and accurate execution.
We had to break down, maintain and rebuild a dike which
controlled the separation of pH2 water from pH neutral
water. |
STEEL
FABRICATION .
FOOD AND AGRICULTURAL INDUSTRY
GO TO TOP
PHARMACEUTICAL AND CHEMICAL INDUSTRY.

Hunt fabricated and erected the structural steel for
this Sterling Pulp Chemical facility, as well
as the performing the construction of the metal building.
Total contract amount: $3 million. |

This process piping was installed
for a pharmaceutical production facility as part of
a turnkey construction operation. |

Hunt performed the process engineering
and installation for this chemical recovery system. |
GO TO TOP
METAL BUILDINGS.

This 500,000 sq.foot Adel, Georgia
facility was completed for JM Manufacturing in just
over 6 months. |

Hunt built this wood chip retrieving facility for Weyerhaeuser's
Adel, Georgia operations, in addition to fabricating
and erecting the structural steel and conveyors. |

Extensive metal buiding work
was done for this Archer Daniels Midland project. ADM
contracted Hunt to build 4 cotton seed warehouses, a
60' truck dumper, receiving pit, scales, conveyors,
structural steel, elevators, a cotton seed oil refining
building and fabricated tanks. |
GO TO TOP
ENVIRONMENTAL.

This 5 mil. liner was installed in a battery plant to
protect the environment from acid contamination. |

This waste water treatment plant lagoon was constructed
for Charoen Pokhand's poultry plant. |

This process sump pit was installed with a 5 mil. liner
to contain sulphuric acid for reclamation. |
|
|
|
Home
Our Expertise
Clients
Projects Contact
Us |
P.O.Box 1606 Valdosta, GA 31601 E-mail: info@hunt-construction.com
Copyright © 2004 Hunt Construction, Inc.
All Rights Reserved. |
|
|